If you do not know the word, you will either freeze or invent. Neither is allowed. Search it here.
Documents
- AddendumA dated change to the bid documents.
- If you estimate without the latest addendum, you estimated a different job. Freeze the set and list addenda on the header sheet.
- 09 67 00CSI section for fluid-applied flooring.
- Start here in the project manual, then hunt related sections and owner standards.
- Division 01General requirements.
- Submittal process, substitutions, hours, closeout, extras. Read it or get surprised by procedure.
- 'Or equal'Substitution language in a spec.
- Equals are submitted, not assumed. Admin never grants equals on the phone.
- RFIRequest for information.
- One question, document conflict, proposed path, need-by date. Log it.
- Shop drawingOur detail of how we will build a condition.
- Cove at pads, trenches, terminations. No drawing, no application on complex details.
- SubmittalOur proposed products/details for approval.
- Before we buy or install. Log stamps. Read 'approved as noted.'
- SubstitutionA product that is not what was specified.
- A process, not a favor. Capture, route, paper. Never yes-on-Friday.
- TakeoffMeasured quantities from drawings.
- SF, LF, EA with sources. Admin may highlight; estimating owns the number that goes on the bid.
Money
- AIA-style billing / SOVProgress bill against a schedule of values.
- Some GCs want G702/G703 format. Mirror the form they pay. Percent complete must be defensible from dailies and walks.
- ExclusionsWhat our price does not include.
- Demo, moisture mitigation, moving equipment, overtime, etc. If it is not written, they will assume it is in.
- Purchase orderBuyer's authorization to spend.
- Read terms. Match numbers on invoices. No job number on a PO we issue is a defect.
- RetainageHeld portion of payment.
- Track as receivable. Closeout paper often unlocks it.
- ACH / wireElectronic payment methods.
- Get the ACH form into the customer's vendor file at award. Large deposits and tight material buys move by wire. Log every payment the same day.
- Schedule of valuesHow the contract price is broken into billable lines.
- Extras get their own lines. Burying them is how they vanish.
- T&MTime and materials.
- Needs daily tickets signed by someone with authority. No ticket, no invoice strength.
- Three-way matchPO + receiving + invoice.
- No match, no pay. Uncoded spend is stolen margin.
- Due Upon CompletionHouse invoice terms. Not Net 30.
- Every Maverick invoice is Due Upon Completion unless Eric approved a written contract exception. Never print Net 30 or Net 15 as a courtesy. SOP 4.12.
- DSO (admin target)Days sales outstanding — admin KPI.
- Admin target is ≤ 38 days. Company scorecard warning band is 46–60 days. Collections cadence is 30 / 60 / 90. Untracked retainage is unpaid work.
Closeout
- As-builtRecord of what was actually installed.
- Colors by room, extra areas, drain work, cove heights that changed by RFI. Closeout needs this. Memory is not an as-built.
- Attic stockSpare material left with the owner.
- Specified extra kits or chips. Get a signed receipt. It is not crew souvenirs.
- Punch listFix list at substantial completion.
- Not the same as closeout. Punch is work. Closeout is the packet.
- WarrantyWritten promise about the installed system.
- Manufacturer and installer forms, correct names, as-installed system. Do not promise years we do not have.
Systems
- BroadcastFlake or quartz thrown into wet resin.
- Creates texture and hide. Rejection, back-roll, and topcoat are part of the system — not a decoration afterthought.
- Integral coveFloor coating turned up the wall in a radius.
- Hygienic detail. Not stick-on vinyl base. Height, radius, and termination are specified. Shop-draw unusual conditions.
- DFT / milsDry film thickness.
- How thick the coating is after cure. Specified in mils. You do not guess a number on the phone.
- ESD / conductive floorElectrostatic dissipative system.
- Electronics and certain manufacturing. Testing and grounding details. Not 'close enough gray epoxy.'
- MilOne thousandth of an inch.
- Coating thickness unit. 20 mils is not 'about 20.' Do not convert casually on the phone.
- MMAMethyl methacrylate — very fast cure.
- Odor, skilled crew, special controls. Not a casual substitute for epoxy.
- PolyasparticFast urethane-family topcoat.
- UV stable, quick return, dew-point and recoat windows matter. Isocyanate awareness.
- Vinyl ester / novolacAggressive chemical / containment systems.
- Specialized install and QA, not 'gray epoxy, thicker.' No validated Maverick SKU yet: escalate to Eric before quoting or submitting.
- Urethane cementHeavy-duty washdown / thermal-shock system.
- Kitchens, food, wet process. Drains and moisture details are the job.
Legal
- Certified payrollPublic-work wage report, usually weekly.
- Classifications and rates must match. Catch prevailing wage at bid/award, not at invoice.
- Change order (CO)Executed change to price, time, or scope.
- A PCO is a proposal. A CO is signed. Do not work extras on a PCO unless Eric accepts that risk in writing.
- COICertificate of insurance.
- Issued by the broker. Never edited in-house. Additional insured names must match the contract. Calendar expirations.
- First furnishingFirst date we provided labor or material.
- Starts lien/notice clocks in many states including Michigan. Log it. Do not guess later.
- Construction lienProperty right to secure payment.
- Michigan has strict notice and timing rules. Admin owns the calendar; counsel and Eric own the filing decision.
- Lump sumOne price for specified scope.
- Extras must be papered. Quantity growth is our problem unless documents change.
- PCOPotential change order.
- Our priced proposal. Not authorization to proceed.
- Contractor's pollution liabilityInsurance for chemical work.
- GL is not enough for resins/solvents. Many portals will reject a coatings contractor without it.
- Prevailing wageMandated wages on many public jobs.
- Flag at intake. Coordinate with payroll before hour one.
- Unit priceContract by SF/LF/EA rates.
- Quantities must be agreed. Measure and sign. Do not mix units.
- Lien waiverDocument giving up lien rights, usually against payment.
- Conditional vs unconditional matters. Never sign away rights for a promise. Follow Eric's process.
- Paid-if-PaidForbidden subcontract payment language.
- Makes the GC's duty to pay Maverick contingent on the Owner first paying the GC. Forbidden effective 2026-06-25. Escalate the 2.14.4 sequence to Eric. Do not sign. Do not email the protocol to a GC.
- Verbal extraUnpapered added scope asked on the slab or in a text.
- Capture. Do not mobilize. PCO. Written proceed. Then work. A casual yes is a change order you gave away.
Field
- CSPConcrete Surface Profile.
- The roughness we create so resin can grab. Maverick defaults: CSP 3–4 for thin-film coatings, CSP 5–6 for broadcast, slurry, and mortar systems. Prep is the job.
- Dew pointTemperature where moisture condenses on the slab.
- If the slab is not at least 5°F above dew point, it is a stop-work condition. Record it on the daily.
- LaitanceWeak, dusty skin on new concrete.
- Must be removed mechanically. Coating over it delaminates.
- Moisture testing (F2170 etc.)Measures vapor in/through the slab.
- ASTM F2170 is in-situ RH, common in specs. High readings stop applications. File locations and photos of the display.
- Surface preparationMechanical work that makes resin stick.
- Shot blast, grind, repair. The most common failure point. Never optional.
- Shot blastSteel shot thrown at the slab to profile it.
- Dust-controlled method of prep. Containment matters in plants.
People
- GCGeneral contractor.
- Often our contract party even when the plant is the end user. Follow the chain unless the contract is owner-direct.
- Nick HoltonInsurance broker — Diversified Insurance Group.
- Issues every COI. nickh@wediginsurance.com, CC MichelleG@wediginsurance.com. 24-hour turnaround. Admin never edits a certificate. Named insured address is Taylor HQ.
Safety
- HazComHazard communication.
- Labels, SDS, training. Admin keeps current SDS packs on site and in the file.
- IsocyanatesChemistry in some urethanes/polyaspartics.
- Exposure controls. Not a casual 'it doesn't smell bad.' Respect the SDS.
- JHA / JSAJob hazard analysis.
- Task-level risks and controls. Dated, in the job file, with toolbox talks.
- OSHA 10 / 30Construction safety training cards.
- Calendar expirations. Some sites will turn people away without them.
- SDSSafety Data Sheet.
- Current year, every product, on site and in file. Auditors and EHS will ask.
- SilicaDust from cutting/grinding concrete.
- Shrouds, vacs, controls. Not heroic sweeping.
- Mix zoneWhere resin is proportioned and the wet edge lives.
- A hazardous operation. Visitors, sales, and owners do not walk it. Anyone in a Maverick shirt can stop a visitor or an application.
- Stop workAuthority to freeze mix, place, or grind.
- Safety, dew point, spec conflict, wrong product, visitor in the mix. You will not be punished for a good stop.
Verticals
- ICRA / ILSMInfection control / interim life safety measures.
- Hospital occupied-work planning. Flag at bid. Barriers, odor, paths, and hours are scope.
- SkydrolAggressive aviation hydraulic fluid.
- Eats the wrong coating. Hangar and aviation-adjacent work needs the right chemical system.
Materials
- Kit / mixProportioned set of resin components.
- POs should match kits to SF at the specified thickness plus waste. Short kits are emergencies.
Quality
- Lot / batch numberManufacturer identity of a kit.
- Pharma and some auto QA will ask. Photograph as drums open. Never invent.
- MockupA specified sample area on site.
- Often becomes the standard of acceptance. Schedule it. Protect it. Photograph it.
- NACE / AMPPCoating inspector culture and certs.
- Profile, cleanliness, ambient conditions, DFT. File numbers as taken. Do not 'clean them up.'
Systems of record
- Zoho CRMOur sales and lead system of record.
- If it is not in Zoho, it is a rumor. Stages, follow-ups, quote PDFs, win/loss reasons.
- Zoho Books (not built)Not a Maverick system of record.
- Zoho Books is NOT BUILT. Never draft a step that reads from or writes to Books. Invoicing = branded DOCX clone. Billing ledger = SOV-Billing-Tracker in the project folder. AR = OneDrive aging tracker. CRM Deal notes for milestones.
Sales
- Qualify (sales)Who / where / what / when / next — before anyone prices.
- If it is not in Zoho it is a rumor. Sales does not freelance price, Net 30, or a Monday start.
Crew
- Own the EquipmentStrap it, clean it, put it back — every roll.
- Prep equipment and vac are $250,000+ on a trailer. Short hop is not an exemption. An unstrapped ~$9k vac took a 10-inch dent; barrel ~$1,400. Anyone can stop a truck that is not tied.
- Ownership standardTook it out → put it back. Dirty → clean it. Can fall → strap it.
- Simple on purpose — the same rule on day one and in year twenty. Seniority is not a pass. After C03, not knowing is a choice.
- Leave-behindWhat the plant sees when we go — dock, edges, trash, tape.
- Cleanup is part of the install. The last 5% (cove, drains, cut-in, holidays) is what they live with. Lead last out. Photo on high-profile sites.