Maverick Performance Solutions

Opening training…

0

Maverick Employee Training Academy

Curriculum

Start with Core training, then complete the modules assigned to your department. Additional modules stay available if you want them.

Finished MavClad industrial floor in a battery storage plant
C01All departments145 min

The Maverick Core

Who we are, who can commit the company, how a resinous floor gets built, safety in the mixing area, the paperwork that gets us paid, and why a text or email can bind Maverick. Every department completes this module first — before selling, installing, or answering the phone.

0/6 lessons

Finished flake floor with the service office beyond the glass
C02All departments85 min

How the other departments work

Cross-training. Sales learns what the crew cannot decide. Crew learns what the office is holding. Field ops learns what estimating actually sold. Office learns what an application actually requires.

0/4 lessons

Maverick trucks and trailers staged in the yard
C03All departments112 min

Own the Equipment

The crew and warehouse standard — and it applies to anyone, from any department, who loads a truck, rides to a site, stands on a dock, or pulls material off a shelf. Taught from step one — the ownership standard — because $250,000+ of prep equipment does not survive 'we'll get it next stop.' Tool-by-tool care, one home for everything, cleanup, the unload a plant manager sees, how material is stored and repackaged, the pallet rule for liquid material, quality details, and why raising the bar is how we get more work and real incentives.

0/7 lessons

Surface preparation underway before a Maverick application
C04All departments108 min

Product Installation Requirements

The critical installation requirements from every Maverick product data sheet, in one module: mix ratios and pot life, batch discipline — mix only what you can place — the wet edge that keeps lines out of our floors, recoat windows, temperature and moisture limits, surface prep, broadcast rules, and the product-specific traps. Required for every crew member; every department can take it.

0/6 lessons

Concrete surface preparation underway ahead of a system install
C05All departments96 min

Surface Preparation

Most adhesion failures are preparation failures. Concrete surface profiles and what each system requires, the three preparation methods and their removal limits, contamination and degreasing, static versus dynamic cracks, and the Maverick single-square standard for patching. Built from the Maverick Surface Prep Techline, Volume 1.

0/5 lessons

Finished resinous system with the coating build-up visible at the edge
P01All departments80 min

Product Knowledge: Coatings & Sealers

Phase 1 product certification, part one. Opens with the Maverick Resinous Chemistry training video. MavCoat is the epoxy-based coating line and MavSeal is the urethane sealer and topcoat line — both applied OVER a MavClad or MavCrete floor. Covers the role each product is allowed to serve, the chemical-versus-mechanical decision, cure speed against humidity, and the film-thickness ceilings that cause blistering. Pass this before Phase 2.

0/2 lessons

Urethane cement floor in a food processing plant
P02All departments82 min

Product Knowledge: Mortars, Toppings & Slopes

Phase 1 product certification, part two — the floor itself. MavClad (epoxy mortar) and MavCrete (urethane cement) are Maverick's two main system lines and build the floor on roughly 99% of our projects, underneath the coatings. Also covers the MavTop decorative broadcast line and the MavGrout sloping grout that builds fall to a drain. This is the section that decides food plants, freezers, and wash-down bays.

0/4 lessons

Concrete repair and joint detail before a system goes down
P03All departments51 min

Product Knowledge: Color, Joints & Repair

Phase 1 product certification, part three. Pigment load ratios and color matching, the control-joint filler and what it must never be asked to do, and the three-product concrete repair matrix. Small products, whole-floor consequences.

0/3 lessons

The job file and the systems a project moves through after it is sold
C06All departments148 min

Sold to Closed Out

What happens from the moment a project is sold until it is closed out. Quote signature, logging the PO, creating and Fast Filling the Order Brief, submitting it, admin approval, the Work Order and the crew app, sending it, the deposit invoice, progress billing and change orders, sub payouts, and closeout through to retainage release. Written so a new hire who has never opened Zoho can do every step alone, first time.

0/12 lessons

A floor being walked and checked on site
C07All departments43 min

Site Visits & Punch Lists

The site visit app for installed jobs: signing in with your company email, linking the job and reading its scope on file, recording the conditions, logging punch-list items camera-first with the right owner and priority, the key plan, the wrap-up and sign-off, what the sync puts in CRM, and the follow-up walk that shows before and after.

0/5 lessons

Day One desk — sample boards, hard hat, and the shop beyond
M01Office depth95 min

Day One & the Maverick Standard

Orientation for the field office. Culture, the admin role, communication standards, and the legal briefing that protects the company and the client.

0/5 lessons

Crew spreading and back-rolling a resinous system
M02Office depth110 min

How Industrial Flooring Actually Works

Systems, specs, surface prep, moisture, cove, and how to read a takeoff. You will not become an installer. You will become dangerous in a good way.

0/4 lessons

Project administrator desk with spec binder and drawings
M03Office depth100 min

Legal, Risk & Michigan Construction Admin

Contracts, insurance, liens, ethics, public work, and the sentences you must never type. Built so someone new can protect a company that already has real jobs on the books.

0/4 lessons

Job file — drawings, chips, takeoff, and the floor in progress
M04Office depth120 min

Project Lifecycle: Bid to Closeout

Lead to warranty. Submittals, RFIs, shop drawings, change orders, and closeout packets. This is the operating system of the office.

0/4 lessons

Crew prepping a Ford service floor with a walk-behind and vac
M05Office depth90 min

Field Coordination for Office Staff

Daily reports, weather and dew point, materials, SDS, jobsite conduct, and enough safety literacy to not get anyone hurt — including you on a site walk.

0/4 lessons

Job-cost desk — invoices, chip, and the plant floor beyond
M06Office depth95 min

Money: Job Cost, Billing, AP/AR

How a floor job makes money, progress bills, extras, collections, payment methods (check, ACH, wire), POs, and vendor receiving.

0/4 lessons

Systems of record — CRM, job files, sample board
M07Office depth85 min

Systems of Record

Zoho CRM, file naming, quoting, shop drawings, email and voice, samples, and inventory. One company, one memory.

0/4 lessons

MavCoat ESD floor in a controlled pharmaceutical suite
M08Office depth85 min

Client Care by Vertical

How to sound like you belong in a plant meeting. Audit posture, bad-news protocol, and the Maverick way when something goes wrong.

0/4 lessons