Maverick Performance Solutions

Opening training…

0

C06 Sold to Closed Out

C06.08

Fill the Work Order in the app

Twelve screens on your phone, chips instead of typing, then Save & sync. The Review screen blocks only on real problems — and it tells you exactly which.

  • Work through all twelve screens of the Work Order app
  • Clear every Review blocker and understand why each one exists
  • Know what a subcontractor sees versus what an internal crew sees

The twelve screens

#ScreenWhat it covers
1JobThe job identity carried from the brief.
2Crew & scheduleWho is doing it and when — start and completion dates, phases.
3Site access & contactsHow the crew gets in and who they call.
4SubstrateWhat we are installing over.
5Systems & materialsThe system going down.
6Tools & equipmentWhat has to be on the truck.
7SafetyPPE, training, testing and site safety requirements.
8Site concernsThe conditions the crew has to work around.
9Labor termsThe labour arrangement for this work order.
10Scope & install planWhat we perform, and the install plan.
11Photos & sketchSite photos and the sketch pad.
12Review & syncThe blocker list, then Save & sync.

Review blockers — what stops a sync, and the fix

BlockerWhy it existsFix
Site concerns is required. Pick "No Concerns" if there are none.CRM refuses a manual save while it is empty — leave it blank and nobody can edit that Work Order by hand afterwards.Pick the real concerns, or tick No Concerns.
"No Concerns" is ticked together with other concerns.CRM refuses a manual save with both.Untick one or the other.
You ticked [concerns]. Write how the crew handles it in Other site notes.CRM refuses a save without it, and it is what the crew and the sub actually work from.Write the handling note.
Completion date is before the start date.The dates are backwards.Fix the dates on Crew & schedule.
Phase N: needs an area / phase name.An unnamed phase row cannot be worked to.Name it, or delete the row.
Phase N: ends before it starts.Phase dates are backwards.Fix the phase dates.
Equipment row N: needs an item name, or delete the row.An empty equipment row is noise on the truck list.Name it or remove it.
[Field] is N characters — the CRM field holds M.The write would bounce.Shorten it.
[Field]: "value" is not a CRM value.The picklist value does not exist in CRM.Pick from the list.
[Field] must be a whole number of 0 or more.A count field has something that is not a count in it.Enter a whole number.
Install plan line looks like a material row and would corrupt the PDF material table.That line would break the Work Order PDF.Reword the install plan line.
Crew lead email does not look valid.Format check only — see the note below.Correct the address, or clear it.

Takeaways

  • Twelve screens, chips over typing, offline drafts, sketch pad and photos. Finish with Save & sync.
  • Site concerns is the blocker that catches most people — CRM refuses a manual save while it is empty.
  • Internal Crew never sees dollars. A subcontractor sees the contract amount and the Installer Agreement.