Maverick Performance Solutions

Opening training…

0

M08 Client Care by Vertical

M08.04

Bad news, problems, and how we handle them

The difference between a contractor people trust and a contractor people replace.

  • Run the bad-news sequence without spinning
  • Use one owner of the message
  • Know when to escalate vs. when to solve
When to escalate
  • Safety, fraud, legal threat?Now — Eric. Stop if needed.
  • Money or idle crew?Same day — do not wait for Friday.
  • Angry client?Acknowledge, do not diagnose, get Eric in.
  • You don't know?Say so. Log it. Written answer today.
  • Routine log work?You own it. Do not escalate noise.

Bad-news sequence

  1. 01
    Internal huddle

    Eric + whoever has facts. Five minutes. No client yet.

  2. 02
    One owner

    One person talks to the client. Others stay off reply-all.

  3. 03
    Facts

    What happened, what we know, what we do not know yet.

  4. 04
    Options

    At least two paths with time and money implications.

  5. 05
    Ask

    A clear decision we need from them, with a time.

  6. 06
    Write it

    Email recap the same day. File it.

Tone

You (after huddle)We stopped the application in Room 12 this morning. In-situ RH is above the system limit in three of four test points (readings attached). Options: (1) wait and retest, (2) price a moisture-mitigation system, (3) resequence to Room 14 which tested in spec. We need your direction by 2:00 so we can keep the crew productive.

Takeaways

  • Facts, options, ask — same day.
  • No blame theater in writing.
  • Open questions go on the log; clients get answers.

SOPSOP Section 2.14 — GC / Architect / Owner Communication StandardsSOP Section 4.28 — Escalation Matrix