Maverick Performance Solutions

Opening training…

0

C05 knowledge check

Surface Preparation

Pass is 80%. This is open-book — use the academy, not hope.

1. Several patches sit close together in the same area and all need topcoating. You:
2. The main purpose of concrete surface preparation is:
3. True or false: on new concrete, the main reason for surface preparation is to remove laitance.
4. The majority of Maverick installations require a profile between:
5. True or false: the higher the CSP number, the rougher the concrete.
6. A thin-mil coating is going down. The preferred preparation method is:
7. Which preparation method is the most versatile and produces an excellent profile for adhesion?
8. Grinding will remove existing coatings up to about:
9. True or false: scarifying is a good choice right before applying a coating.
10. Aside from small grinders, preparation equipment typically requires:
11. A drop of water placed on the slab beads up instead of soaking in. That means:
12. Degreasing a contaminated slab is performed:
13. You are degreasing a heavily contaminated slab with Simple Green. The concentration and dwell are:
14. Shot blasting is finished and the slab is swept and vacuumed. The step still missing is:
15. A crack measures wider than 1/4 inch. You treat it as:
16. Static cracks under a thinner system — broadcast, self-leveler, or coating — are filled with:
17. True or false: fiberglass crack treatment is 100% effective at stopping cracks from coming through the finished system.
18. Prep is running far slower than planned and the profile is not coming up. A likely cause is:
Back to module