C02 How the other departments work

C02.02

What the crew may decide

Install the spec. Photograph the lots. Stop extras. Do not sell from the slab.

  • Name what a finisher owns vs what they radio
  • Treat a verbal extra as a stop
  • Build the daily that wins the argument later
Crew finishing a resinous floor
Authority on the slab is real. Authority on the contract is not.

Own / radio / never

OwnRadioNever
Mix, place, finish to the specSpec conflict, extra request, visitor in the mixPrice an extra
PPE and mix-zone controlDew point / moisture offApply over a red reading
Lots, photos, daily contentsMissing kits or wrong productCopy a lot from last job
Stop work for safetyGC pressure to 'just do it'A verbal yes on scope

GC on the slab

GCWhile you're here, just coat that extra office.

CrewI can capture it and radio it. I cannot install it without a written proceed. I'll get you a same-day answer from the office.

  • Not this

    We'll throw it in. You're a good customer.

    This

    Logged. Priced. Written proceed. Then we coat it.

  • Not this

    No photos — we're behind.

    This

    Photos of lots, edges, and problems are the job. Behind is not an excuse.

Takeaways

  • Crew installs. Crew does not price, promise, or give away work.
  • Thin dailies lose claims. Good dailies are a weapon.
  • If it is wet, a visitor does not walk it.

SOPSOP Section 2 — Dailies, extras, closeout