Closeout, warranties, samples, attic stock

Retainage hides in missing paper. Build the closeout pack while you still remember the application.

  • Start the closeout binder at award, not at punch
  • Know the usual contents of a flooring closeout
  • Treat extra material and color records as money

Closeout pack (start empty folders on Day 1 of the job)

  1. 01
    Warranties

    Manufacturer and installer. Dated, signed, correct legal names.

  2. 02
    Product data / SDS

    As-installed, not as-bid if it changed by approved submittal.

  3. 03
    QA

    Moisture tests, mil readings if required, ESD tests, mockup photos, batch / lot stickers.

  4. 04
    As-builts

    Where we differed, drain work, extra rooms, colors by room.

  5. 05
    Spare / attic stock

    Quantities turned over, signed receipt.

  6. 06
    Lien waivers

    Conditional / unconditional as required to release retainage.

Warranty calls

When a client calls about a blister or a stain, open a ticket, do not diagnose on the phone, pull the job's QA pack, and route to Eric / field lead. First response is courtesy and a site-visit window — not a confession and not a denial.

Takeaways

  • Closeout is a running file.
  • Pharma will ask for lot numbers. Auto will ask for warranties. Schools will ask for everything twice.
  • Attic stock and leftover kits are inventory, not souvenirs.

SOPSOP Section 2.12 — Closeout