M08.02
Pharma, cleanroom, and hygienic work
Cove, traceability, and auditors who will ask for last month's lot numbers.
- Build a QA pack as the application happens
- Treat integral cove as a specified system, not trim
- Answer auditors with files, not stories

What 'audit ready' means for admin
Lot stickers off the kits, installer names if required, SDS, batch certificates, environmental readings, photos of cove details, change control if the system shifted, cleaning of our own mess. Some suites require us to be trained on gowning. Put that training on the crew matrix before mobilization. When an auditor calls, you already have a PDF packet — you do not assemble one from texts.
- Not this
We'll find the lot numbers later.
ThisPhotograph lots as drums are opened. File same day.
- Not this
It's just a warehouse epoxy in a white color.
ThisHygienic systems and details are specified. Quote and submittal must match.
Takeaways
- Traceability is the product.
- Gowning and access rules are not optional politeness.
- Never invent a lot number.
SOPSOP Section 10 — Market Sector PlaybookSOP Section 2.12 — Closeout

