C04 knowledge check

Product Installation Requirements

Pass is 80%. This is open-book — use the academy, not hope.

1. How much material do you mix per batch?
2. On a large MavCrete placement, abutting edges must be laid:
3. Applying MavSeal UPA, the gap between one mix and the next must not exceed:
4. It is 56°F in the plant and the system calls for a polyaspartic topcoat. You:
5. The second epoxy coat was supposed to go down within 24 hours. It's now hour 30. You:
6. The slab tests at 6 lbs MVER / 82% RH. The spec is a standard epoxy system. What goes down today?
7. Applying MavSeal UHD topcoat, you:
8. You cannot find the data sheet for the product on the truck. You: