C04 Product Installation Requirements

C04.02

Mix only what you can place

Pot life is a countdown that starts the second Part B hits Part A. Batch size is set by how fast the crew can place material — never by how big the pail is.

  • Size every batch to what the crew can place inside the sheet's working time
  • Run the mixing rules that change by product — order, speed, time, induction
  • Know why material waiting in a pail dies faster than material on the floor

The clock you cannot argue with

The MavCoat PC sheet says it in one line: material left in the pail will generate heat and have a reduced pot life. A full pail is a chemical reaction feeding on itself. The same gallon spread at 16 mils on the floor lives far longer than it does massed in the bucket. That is why almost every sheet gives the same two orders — empty the mixed material onto the floor immediately, in a bead, and never try to roll it out of the bucket or a pan unless the sheet says dip-and-roll. Batch size is a planning decision the lead makes from the sheet's working time and the crew's real placement speed — before the first mix.

The clock, and how the products compare
MIXclock startsON THE FLOORbead out in 2–3 minSPREAD + BACK-ROLLwhile it is wetTACKhands offDEADtrash itWorking time at ~72°F — heat and humidity shrink every barMavSeal RCU13 minMavCrete UM / MavGrout USP15 minMavCoat FC15 minMavCoat PC / CRE / HPE / OPE25 minMavSeal UPA Fast25 minMavSeal UPA Medium32 minMavSeal HWU35 minMavSeal HTU / UHD60 minMavSeal UPA Slow70 minMavSeal UPA XTRA Slow120 minBATCH SIZE =what the crew placesinside this window,never what fitsin the pail.Pail heat kills faster —get it on the floor.

Working time at ~72–77°F — from each product's data sheet (heat and humidity shorten all of these)

ProductWorking timeThe line that matters
MavSeal RCU13 minutesSpread within 2 minutes of mixing. Crew in position before you mix.
MavRapidPatchUse within 2–3 minutesMix 20–30 seconds. Do not rework it once it sets.
MavCrete UM / MavGrout USP15 minutesOn the floor within 3 minutes of mixing.
MavCoat FC10–15 minutesFast-cure primer. Bead on the floor immediately.
MavPolyPatch15 min on floor (Fast: 10–15)Mixing longer than 60 seconds makes it catalyze faster.
MavCoat SLESlow 35–40 / Standard 20–25 / Fast 12–17 minPick the activator speed for the job and crew.
MavCoat PC / CRE / HPE / OPE / MavClad EM25 minutesRibbon bead on the floor, spread on spike shoes.
MavCoat CES25 minutesHand-mix with a stir stick only. Never drill mix. One kit at a time.
MavCoat Metallic30–35 minutesBlend 16 oz acetone plus the 32 oz Metallic Additive before Part B.
MavCoat PolyureaXTRA Slow 60 / Slow 30 / Medium 15 / Fast 10 minAt 80% humidity those become 30 / 20 / 12 / 8.
MavSeal UPAXTRA Slow 2 hr / Slow 70 / Medium 32 / Fast 25 minAt 80% humidity: 70 / 28 / 17 / 14. Dip-and-roll nearly doubles work time.
MavSeal HTU / UHD60 minutesHTU: 5-minute induction after mixing, then stir gently.
MavSeal HWU35 minutesOne kit at a time. Never partial mixes.
MavCoat WBE~1 hour15-minute induction after mixing before it goes down.
MavJoint JFGel in 45–50 secondsDispensed through a static mixer — the gun is the pot.

Mixing that holds up

  1. 01
    Measure, never eyeball

    The ratio on the sheet, by volume (or by weight where the sheet says weight — MavCoat ESD is mixed in pounds). Premeasure before anything combines.

  2. 02
    Right order

    Some products mix in a required order: MavSeal HTU is Wear Filler into Part B, then Part A. MavSeal HWU is Part B, tint, Part C filler, then Part A. Tints premix into the side the tint sheet names.

  3. 03
    Low-speed mechanical mix

    Jiffy-type blade at low speed for the time the sheet gives. Scrape the sides and bottom — the PC sheet warns that unmixed material on the pail wall will never cure. Do not whip air in.

  4. 04
    Onto the floor, now

    Empty the batch in a long bead 8–12 inches wide and spread. Do not scrape the sides onto the floor, do not invert the pail to drain.

  5. 05
    Full kits only

    Where the sheet says full kits (MavSeal UPA topcoats, RCU, CRE), a partial mix is a ratio error waiting to happen. Do not split kits.

  • Not this

    Mix both kits so we're not waiting on the mixer.

    This

    One batch mixing while one is being placed. The mixer waits for the floor — never the other way.

  • Not this

    It's stiffening — thin it with a splash of solvent.

    This

    Dead material goes in the trash, not on the floor. MavRapidPatch says it flat: do not thin with solvents.

Takeaways

  • Mix only what you can handle. If the crew places a kit in 12 minutes, you mix one kit — not two because walking back is annoying.
  • Mass in a pail generates heat, and heat eats pot life. Get material out of the pail and onto the floor immediately.
  • Heat and humidity shorten every working time on every sheet. A 25-minute product is not a 25-minute product in July.

SOPSOP Section 2.7.8 — Field Non-Negotiables