C04 Product Installation Requirements

C04.05

Epoxies, basecoats, and the moisture ladder

The epoxy family shares a rhythm — 2:1, bead on the floor, 24-hour recoat — but every sheet has its own temperatures, windows, and moisture tolerance. Know the ladder before anyone opens a kit.

  • Run the epoxy numbers: ratios, windows, temperatures, coverage
  • Read the moisture ladder — which product survives which slab
  • Broadcast correctly: to rejection, never into the wet edge, never piled

Epoxy coatings and basecoats — critical numbers per sheet

ProductRatioWorking timeRecoat windowTemps (air/surface · material)Coverage
MavCoat PC2:125 min potWithin 24 hr @70°F50–90°F ambient · ≥5°F over dew100 sq ft/gal @16 mils (prime 175–250)
MavCoat HPE2A:1B by volume25 min pot @77°F24 hr max — miss it and the surface must be sanded before recoatingAir 50–90°F · surface at least 5°F above dew point · store 65–80°F16 wet mils = 100 sq ft/gal per coat · as primer 175–250 sq ft/gal (thinnable up to 5% xylene)
MavCoat CRE2:125 min pot24 hrSubstrate 55–90°F8–16 mils · 100–200 sq ft/gal
MavCoat OPE (orange peel)2:125 min pot24 hrSubstrate 55–90°F8–16 mils; texture from consistent back-roll — never thin or re-ratio it
MavCoat SLE (self-leveling)2:1Slow 35–40 / Std 20–25 / Fast 12–17 minMin 14/8/5 hr · max 24 hr35–85°F (below 60° use Fast) · 60–85°F10–30 mils · 53–160 sq ft/gal
MavCoat FC (fast-cure)2:110–15 minMin 4 hr · max 24 hr35–85°F · 60–85°F16 mils = 100 sq ft/gal (16 mils required for its moisture rating)
MavCoat Metallic2:1 + 16 oz acetone + 32 oz additive30–35 minMin 16 hr · max 48 hr60–85°F all three32–80 mils · 20–50 sq ft/gal; indoor only — UV is its enemy
MavCoat Flex1:120–25 minMin 10 hr · max 24 hr60–85°F all three20–30 mils; never stand-alone — must be overcoated
MavCoat WBE (water-based)4:1~1 hr pot after 15-min induction12–24 hr50–90°F; RH under 85%; never within 5°F of dew4–6 mils · 250–350 sq ft/gal · two coats; freezing destroys it
MavCoat CES (epoxy siloxane)2:125 minWithin the base epoxy's window or sandAir/surface 45–95°F · material 60–85°F320–535 sq ft/gal; NEVER over 8 mils; hand-mix only
MavPrime EP (primer)2:130–35 minMin 6 hr · max 24 hr60–85°F all three3–8 mils · 200–533 sq ft/gal; tight thin coat, inspect for pinholes
MavCoat HB / MavCoat SLE2:110–15 min to placeNext coat within 24 hr or degloss60–85°F all threePrimer 3–8 mils · SLE 8–30 mils per system
MavClad EM (trowel topping)2:1 binder25 min potGrout/topcoat within 24 hrAmbient 50–95°F1/4 inch · 120 sq ft per 3-gal + 200 lb aggregate mix
MavCoat Polyurea (chip basecoat)2:110–60 min by speedChip immediately, seal after scrape (~1.5 hr)Air/surface 35–85°F (below 50° use Medium/Fast)6–8 mils ONLY · 200–267 sq ft/gal — thicker foams in joints and holes

The moisture ladder — MVER (ASTM F1869) and slab RH (ASTM F2170) limits per sheet

Slab tests atWhat can go down
≤3 lbs / ≤75% RHStandard family — PC, HPE, CRE, OPE, SLE, WBE, CES, Polyurea, UPA, HWU, UHD, EM, MavPrime EP
≤12 lbs / ≤85% RHMavCoat FC at a full 16 mils (the UFB 1-Day system) · MavCrete UQ-HD
≤20 lbs / ≤99% RHMavCrete UF-HD, UM-SL, and MavTop UQB urethane cement systems
≤25 lbs / ≤95% RHMavCoat MVB moisture vapor barrier at 16 mils — then the system goes over it
Over the product's limitSTOP. Nothing goes down. The office picks the mitigation — that is never a field call.
The moisture ladder, at a glance
OVER THE SHEET'S LIMIT = STOPReadings to the office — mitigation is their call, never a field improvisation≤ 3 lbs · ≤ 75% RHStandard family — PC, HPE, CRE, OPE, SLE, WBE, CES, UPA, HWU, UHD, EM, Polyurea, MavPrime EP≤ 12 lbs · ≤ 85% RHMavCoat FC at a full 16 mils · MavCrete UQ-HD≤ 20 lbs · ≤ 99% RHMavCrete UF-HD · UM-SL · MavTop UQB systems≤ 25 lbs · ≤ 95% RHMavCoat MVB @ 16 mils — system over itMVER by ASTM F1869 (calcium chloride) · slab RH by ASTM F2170 — tested before anything goes down

Broadcast rules — chip, quartz, and sand

  1. 01
    To rejection means to rejection

    Keep throwing until no wet spot shows. Chip covers about 6 sq ft/lb; quartz on urethane cement runs about 0.75 lb/sq ft; 20/40 silica on the PC system runs 0.4–0.5 lb/sq ft.

  2. 02
    Toss it into the air

    Broadcast falls like rain, it is never dumped. Piles telegraph through every coat that follows.

  3. 03
    Stay out of the wet

    Do not walk in broadcast resin, and never broadcast into a wet edge that has not been settled and back-rolled.

  4. 04
    Polyurea moves fast

    Chip goes into MavCoat Polyurea before the surface skins — on Fast that is minutes. Scrape and recover loose flake after ~1.5 hours, then seal.

  5. 05
    Scrape before the next coat

    Vacuum and gently scrape loose broadcast after cure. Loose chip under a topcoat is a defect you installed on purpose.

  • Not this

    The slab tested 5 lbs — the epoxy label says moisture 'resistant,' send it.

    This

    Standard epoxies stop at 3 lbs / 75%. Over that, the office chooses FC at 16 mils, MVB, or urethane cement. Coating over a wet slab buys a delamination.

  • Not this

    We missed the recoat window by a few hours — it looks fine, keep going.

    This

    The sheets are unanimous: outside the window, sand until the gloss is gone, vacuum, then coat.

Takeaways

  • Standard epoxies tolerate 3 lbs MVER / 75% RH. Higher than that and the slab needs FC at 16 mils, MavCoat MVB, or a urethane cement system — that is an office decision, not a field improvisation.
  • Miss a 24-hour recoat window and the sheet says sand the surface before the next coat. Every time.
  • Outgassing is managed, not hoped away: falling slab temperature, a tight thin prime coat, double prime on porous slabs.

SOPSOP Section 2.7.8 — Field Non-Negotiables